Construction of Electrical Substation to feed some loads at Al-Faqhriyah district in Riyadh.
Construction of a substation to feed the some loads at Al-Faqhriyah district in Riyadh (2009-2011)
Project Date2018-12-20
ClassificationPOWER
Project Cost3,889,500
Project Duration24 months